We’re pleased to report a significant advancement in the construction of the 20,000-square-foot extension at The Document Warehouse in Sittingbourne, Kent, for our client Restore PLC
The reinforced concrete floor has now been poured, covering 2,000m² with a 250mm-thick slab and using 500m³ of concrete.

Completed over 3 days and nights, the floor meets FM2 tolerance standards, ensuring a durable and high-quality surface for the building’s future use. With this phase finished, we’re on track to continue the project as planned.